Railway to Modi’in – Section 8.

The project includes: Bridge 14 - 250 meters long, constructed using the incremental method. Tunnel 12 under Route 1 – approximately 300 meters long, constructed using the CUT&COVER method. Tunnel 13, 220 meters long. The front part is composed of arches with stone covering.
Retaining walls built with reinforced soil with a total length of approximately 8,000 meters and a height of 12 meters.