Motza Bridge

 The road will be widened to three lanes in each direction, including traffic separators, shoulders and safety barriers. The work includes several basic elements: 
Motza bridges, about 800 meters long each, earth filling and road laying in Wadi Arza, construction of ramps, retaining walls, pathways to the bridge abutments and preparations for high-voltage electricity lines.