Dov Hoz Interchange

Deposition of "Netivei Ayalon" highway under the Dov Hoz interchange, paving of three lanes in each direction. Construction of entrance and exit ramps and the connection of the section to Wolfson interchange in the northern part.

Deposition of “Netivei Ayalon” highway under the Dov Hoz interchange, paving of three lanes in each direction. Construction of entrance and exit ramps and the connection of the section to Wolfson interchange in the north. Construction of acoustic walls using precast method and separation walls between the railway lines in the direction of Rishon Lezion, drainage systems, lighting, infrastructures and traffic lights and control bridges with signage.

Contact us