Danya-Cebus was the General Contractor for establishing the biggest mall in eastern Europe. The construction was completed in just 24 months... Calling Card - AFI PALACE built up structure - 250,000 m2 in 3 main levels (basement + 2 commercial levels). 125,000 m3 of concrete. over 4,500 tons of steel. 30,000 m2 of flooring and covering. 45,000 m2 of curtian walls. 12,000 m2 of sky-lights. 20 cinemas and a unique IMAX. ventilation systems include: 6 coling towers, 8 chillers, 120,000 m2 of ventilation canals. Electric system includes: 12 megawatt unstalltion, outside transformation station, 3 internal power stations. 52 meters radius of Dome with a 4,250 m2 Dome area.
|