Construction of the Ben-Gurion Airport - Jerusalem railway line with sidelines to Modieen and Rishon LewZion. The project includes a tunnel, retaining walls, earthworks and three bridges, as follows: Bridge No. 1 - 565m long, 20 spans at an 18m maximum height. Bridge No. 4 - 120m long, 6 spans at 7m maximum height. Bridge No. 5 - 150m long, 5 spans at 7m maximum height. Customer: Israel Railway Ltd Architect: Micha Brechmeir Construction: Amy Metom Ltd Supervision: Baran Projects Construction Ltd Building Method: Infrastructure (conventional - industrialized) |