About Press Service Suppliers Workers Jobs Contacts עברית
Infrastructure
Dov Hoz Interchange
Yoseftal Interchange
Railway Line to Jerusalem
Modieen Railway
Section of Highway 40
Cross-Israel Highway Section 18
Road 4 Binyamina Railway Grade
Cross-Israel Highway 6 Widening

Modieen Railway
The project Includes: Bridge 14 - 250m long bridge constructed according to the thrust method.  Bridge construction consumed 12,500 cubic meters of concrete, including pressing works. Tunnel 12 beneath Highway 1 - about 300m long, constructed through the Cut&Cover method, with five traffic passages in Highway 1.  Total concrete consumption - 15,500 cubic meters. Tunnel 13 - 220m long.  Front constructed of stone clad arches.  Total concrete consumption - 12,500 cubic meters. Retaining walls constructed through the reinforced soil method, amounting to about 8,000 square meters and reaching a 12m height.  This is the first construction project that used an innovative method, developed by Cebus-Rimon. Reinforced concrete retaining walls and drainage and communication channels. Earthworks, paving, filling, drainage, sub-bases, lighting, traffic regulation, asphalt (including sub-bases and asphalt in highway 1), electricity, about 2,000m long steel guard-rails, sealing of about 30,000 square meters area and fixed soil anchors. Sprayed concrete with architectural coating over a 5,000 square meters area.  About 3,100 cubic meters of pre-cast (prestressed) concrete. Project volume:  some NIS108M over 25 months.  Customer: Israel Railway Ltd   Architect:  Micha Brechmeir  Construction:  P.K.Z. Engineering  Supervision:  Dana Engineering  Building Method:  Infrastructure (conventional - industrialized)
 Previous   1  | 2  | 3     Next 
Address: St. Yoni Nethanyahu 1c, Or Yehuda, 60250 | Phone: 03-5383838 | Fax: 03-6340340 Site Map