The project included submerging Netivay Ayalon South beneath Yoseftal intersection, paving two, three lanes each, routes (NB and SB), construction of Yoseftal bridge (including up and down going ramps). Construction of acoustic walls along Netivay Ayalon, and construction of casing walls and acoustic walls, separating the future railway to Rishon Le`Zion. Construction and installation of drainage, lighting, control systems and traffic lights infrastructure. Construction of rainwater collection ponds with dedicated pumping systems. Danya-Cebus contended with the challenge of executing the project at the center of a busy city center, with multiple infrastructures, traffic regulation and coordination with numerous entities and organizations. Financial volume: Some NIS30M. Customer: Netivay Ayalon Ltd Architect: Elisha Houseman Supervision: Eldad Spivak Building Method: Infrastructure (conventional) |
|
|