The project included submerging Netivay Ayalon beneath Dov Hoz intersection, paving two, three lanes each, routes (NB and SB), construction of Dov Hoz bridge (including up and down going ramps) and connecting the section to Wolfson Interchange in the north. Construction of acoustic walls along Netivay Ayalon, employing a pre-cast method developed by the Infrastructures Division Engineer and Cebus-Rimon Engineers, and casing walls and acoustic walls, separating the future railway to Rishon Le`Zion. Construction and installation of drainage, lighting, control systems, traffic lights infrastructure and signs and control bridges. Danya-Cebus contended with the challenge of executing the project at the center of a busy city center, with multiple infrastructures, traffic regulation and coordination with numerous entities and organizations. Financial volume: Some NIS150M Customer: Netivay Ayalon Ltd Architect: Elisha Houseman Supervision: Eldad Spivak Building Method: Infrastructure (conventional) |
|
|